Dansons Group V-200 Stove User Manual


 
Can
adian Comfort Industries V05 9 VULCAN “V” SERIES OWNERS MANUAL
Copyright 2005
Dansons Group Inc.
PLANNING & INSTALLATION CHECK LIST
Unless you are knowledgeable and experienced in stove installation, we recommend your VULCAN “V”
SERIES stove receive a Pre-delivery Check and be installed by your local Specialty Retailer or Certified
HVAC Service Depot.
COMPLETE THIS CHECK LIST PRIOR TO INSTALLING YOUR PELLET APPLIANCE:
_____ Carefully read this "Owner's Manual”. SAVE THIS MANUAL.
_____ Have your local Dealer demonstrate all the operational, cleaning and maintenance steps necessary
for your stove.
_____ Select a location. The design of your home and the stove placement will determine its value as a
source of heat. A pellet appliance depends primarily on air circulation to disperse its heat. There are
other practical considerations, which must be considered before a final placement is decided on:
Existing Chimneys, Pellet Fuel Storage, Aesthetic Considerations, Roof Design (rafter
locations & roof pitch), Room Traffic, Clearances to Combustibles, and Existing Wiring.
_____ The installation of this appliance must conform to local codes and applicable state and federal
requirements. Becoming familiar with these requirements before installation is essential.
_____ Sign and keep a copy of the Pre-delivery Check List supplied by your Authorized VULCAN “V”
SERIES Dealer, OR “Dansons Certified Installer”, found inside our appliance or available online.
Register online at www.dansons.com/support
for Extended Warranty.
______ Register your purchase online at www.dansons.com/support.
COMPLETE THIS CHECK LIST WHILE INSTALLING YOUR PELLET APPLIANCE:
_____ Carefully read the ENTIRE installation section first.
_____ Read the Freestanding or Insert or Built-In section (which ever applies)
_____ Determine the location and measurement needed your chosen location.
_____ Be sure to pre-fit all items before you install, fasten or install the stove permanently. Remember
measure twice, cut once.
_____ Ensure ALL joints of “PL” vent and single wall stainless steel liner are tightly connected, sealed
with RTV Silicone, including to the exhaust connector, and is correctly installed. (Follow vent
manufacturer’s instructions.)
COMPLETE THIS CHECK LIST PRIOR TO LIGHTING YOUR FIRST FIRE:
_____ Obtain final inspection and approval by local building officials.
_____ Carefully clean all marks off the brass, nickel or pewter parts before the first fire is lit. Use a soft cloth
and a gentle type cleaner. Caution: Never use an abrasive cleaner on any part of your stove.
_____ Polish the hopper to remove the oil type coating used in manufacturing.
_____ The high temp. stove paint used on your stove may take several hours of burning at a high fuel setting to
fully cure. During this time an odor, which is not harmful, may be evident. The area around the stove
should be well ventilated.
_____ Review and follow the Lighting and Controls Instructions.
_____ Fill the hopper with quality pellets to prime the unit; Using the CCI “AcuTron”, (figure 5), PUSH the
FEED RATE Touch Pad and this will start the auger and the combustion fan.