Desa Tech CGP11 Gas Heater User Manual


 
6
2. Mark two mounting screw locations on wall (see Figure 3).
INSTALLING HEATER TO WALL
Marking Screw Locations
1. Determine where you will locate heater.
Figure 3 - Mounting Screw Locations
Mounting
Screw
Locations
10 7/8"
Minimum To
Maintain 8"
Clearance
From Wall
7 3/4"
20 1/4"
Minimum To
Maintain 3"
Clearance
From Floor
FLOOR
JOINING WALL
For convenience and efficiency, install heater
• where there is easy access for operation, inspection, and service
• in coldest part of room
Figure 2 - Mounting Clearances As Viewed From Front of Heater
!
WARNING ICON G 001
WARNING
Maintain minimum clearances shown in Figure 3. If you can,
provide greater clearances from floor and joining wall.
36"
3"
FLOOR
CEILING
Minimum
Minimum To Top Surface
Of Carpeting, Tile Or Other
Combustible Material
8"
Minimum
From
Sides Of
Heater
Right
Side
Left
Side