Chief Manufacturing PLP Series Indoor Furnishings User Manual


 
Installation Instructions PLP Series
6
PLP INSTALLATION (Cont’d)
Mount the PLP
To mount the PLP, do the following:
1. Holding the PLP against the wall, select the pair of
mounting holes that best suits your situation (see
Figures 5, 6, and 7).
NOTE: The mounting holes are slotted to allow for a
small degree of lateral movement. The mount can
be centered, or shifted to the left of center, or
right of center depending on stud location.
2. Depending on your situation, install the lag bolts and
washers into the pilot holes previously drilled, as
described below.
Option A. Install four 5/16” x 2-½” lag bolts
(20) and four 5/16” washers (30) (two top and
two bottom) into the mounting holes, centering
the PLP on dual wood studs 16” apart on center
as shown in Figure 5.
OR
Option B. Install four 5/16” x 2-½” lag bolts (20)
and four 5/16” washers (30) (two top and two
bottom) into the mounting holes that are right of
center on dual wood studs 16” apart as shown in
Figure 6.
OR
Option C. Install four 5/16” x 2-½” lag bolts
(20) and four 5/16” washers (30) (two top and
two bottom) into the mounting holes that are left
of center on dual wood studs 16” apart dual
wood studs 16” apart on center as shown in
Figure 6.
OR
Option D. Install four 5/16” x 2-½” lag bolts
(20) and four 5/16” washers (30) (two top and
two bottom) into the mounting holes, centering
the PLP on dual wood studs 24” apart on center
as shown in Figure 7.
3. Tighten all lag bolts.
Figure 5. Mounting Holes – 16” Apart on Center
(Option A)
Figure 6. Mounting Holes – 16" Apart on Center
(Options B and C)
Figure 7. Mounting Holes – 24" Apart On Center
(Option D)
Option B
Option C
Option A
Option D