3
INSTALLATION INSTRUCTIONS
Unpacking: Before assembling and installing your ceiling fan, remove all parts from the shipping cartons and check them
against the parts listed here. Before discarding packaging material, be certain that all parts have been removed.
PERMA
•
LOCK™ HARDWARE
NOTE: If this is the second Versa•Touch fan in-
stalled in the same area, one of the fans MUST
have its channel changed. Please refer to the
Versa•Touch section on the bottom of page 9.
Setup. Remove the bottom foam from the box
and place the fan rightside up in the foam. This
protects the lamp socket during assembly.
WORK BENCH SETUP
FOAM
WORK BENCH
S3
™
FAN PREPARATION
Prepare for fan installation as follows:
Step A. Route the wires from the motor through the
Perma
•
Lock™ downrod and ball assembly.
Step B. Using the provided allen wrench, loosen the set screw
several turns to allow installation of the downrod. Thread
the downrod into the motor coupling until it stops turning,
this will take at least four and a half full turns.
Step C. Securely tighten the set screw with the provided allen
wrench to ensure safe operation of your fan.
Tip: The downrod has a tapered thread
that is designed to lock completely when
correctly installed.
CAUTION: Failure to fully lock in the down-
rod before securely tightening the allen set
screw may cause the fan to separate from
the downrod during normal operation!
IMPORTANT SAFETY INFORMATION!
BEFORE STARTING THE INSTALLATION OF YOUR CEILING FAN, INSTALL THE
THREADED DOWNROD INTO THE MOTOR COUPLING AND LOCK THE ASSEMBLY
DOWNROD & BALL
ASSEMBLY
ALLEN SET SCREW
1
⁄
4
-20 x
1
⁄
4
"
(PRE-INSTALLED)
3mm
ALLEN WRENCH
MOTOR
COUPLING
TAPERED
THREAD
MOTOR
WIRES
GROUND
WIRE
ALLEN
SET SCREW
DOWNROD
& BALL
ASSEMBLY