New Buck Corporation ZCBB Gas Heater User Manual


 
D
DATEREV.
BY
INSTALLATION INSTRUCTIONS FOR MODEL ZCBB OPTIONAL
WOODEN FLUSH MOUNT MANTEL FRONT (FF) (KIT#PAKDMZCBBFF)
“NOTE: Follow the framing instructions on page(s) 6 & 7. With the exception of the placement
of the ZCBB in the framed opening . The ZCBB must be placed with the front surface of the
appliance 1-9/16” out from the finished wall. This well allow the FF to set flush with the front of
the ZCBB”.
CLEARANCES:
1. Sidewall Clearances: Clearances from the side of the firebox opening to any adjacent
combustible wall should not be less than 7". (See page 8, figure 4)
2. Ceiling Clearances: The ceiling height should not be less than 42" from the top of the firebox
opening.
INSTALLATION INSTRUCTIONS:
1. After removing the FF kit from its packaging follow any pre-installation instructions provided
with the kit.
2. Place the FF over the front of the ZCBB, centering the opening in the FF left to right with the
ZCBB front.
3. Next you must secure the FF to the finished wall surface. You may use “L” brackets, screws or
finishing nails (not provided with the FF).
NOTE: If an unfinished FF kit is used, do not operate the appliance while finishing the wood or be-
fore the finish has dried properly.
ZCBB
TOP VIEW
FINISHED WALL FACE
6”
60”
49-1/2”
53”
ZCBB
ZCBB & FF FRONTS
ARE FLUSH.
1-9/16”
FRONT VIEW
SIDE VIEW
10