Bryan Boilers Tube Steel Boilers Boiler User Manual


 
Boiler Comparison Guide
5
Space requirements. Bryan fl exible water tube steel
boilers generally require less fl oor space than comparable
cast iron units. The bent tube, removable from only one
side, requires approximately 24 to 32 inches of service
area, the same as most cast iron boilers.
With a fi retube steel boiler, the fl oor space used by
the unit itself must be doubled in order to accommodate
tube replacement.
An additional space-saving benefi t of Bryan fl exible
water tube steel boilers is reverse construction. This
optional design allows two boilers to face each other,
thus sharing the same service area and saving space in
the mechanical room.
Cleaning. Generally speaking, easy access makes Bryan
exible water tube steel boilers more convenient to clean
than either cast iron or fi retube units.
Removing a Bryan boiler’s jacket access door and tube
panel exposes the entire bank of fl exible water tubes.
An ordinary fl ue brush and vacuum cleaner are all that
is needed for complete cleaning.
Maintenance. With cast iron or fi retube boilers, replacing
the unit or tubes often means complete disassembly,
welding, rolling and an outside contractor. The water
tubes in a Bryan fl exible water tube steel boiler, on the
Competitive water tube boilers can require twice as much
space for service for half as much capacity. Bryans' standard
and reverse combination make it the best investment.
Cast iron boilers require a
section width area for service,
equals wider foot print.
Bryan design provides easy access
for the service and maintenance of
tubes and burner.
other hand, can be replaced by a general maintenance
worker in about thirty minutes.
Replacement tubes are available from Bryan
representatives within twenty-four hours. And, most
temporary tube repairs may be made in minutes allowing
operations to continue until replacement tubes arrive.
Firetube boilers require
oor space equal to boiler
size for tube removal.
Firetube
Cast IronOther Water Tubes
BRYAN
Space Requirements – 3,000 MBH Boiler