Bryan Boilers CLM-150-S150-GI Boiler User Manual


 
Low initial cost, high operating effi ciency
deliver substantial return on investment
Water Boiler
Combination thermometer and pres-
sure gauge, ASME-rated boiler relief
valve, water temperature control
(240°F max. std.), high limit control,
probe LWCO.
Steam Boiler
Steam pressure gauge, steam pres-
sure control, combination low water
cutoff and pump control, auxiliary low
water cutoff with manual reset, high
limit pressure control, ASME-rated
boiler relief valve, water glass set.
Atmospheric equipment
Electronic combustion safety control,
automatic operating gas valve, safety
gas valve, pilot solenoid valve, electric
When ordering, please
specify:
1. Boiler size
2. Supply and return
temperatures required
3. Boiler relief valve setting
4. Type of fuel: natural
or LP, BTU content,
specifi c gravity and
pressure available
5. Optional extra equip-
ment or construction
6. Special approvals re-
quired (UL, CUL,
CSD-1, FM or IRI)
7. Altitude
Bryan CLM Series Boilers Standard and Optional Equipment
STANDARD EQUIPMENT
FURNISHED
Quality Construction Features
A. Heavy steel boiler frame, built and stamped
in accordance with the appropriate ASME
boiler code.
B. Large volume water leg downcomers pro-
mote rapid internal circulation, temperature
equalization and effi cient heat transfer.
C. Bryan bent water tubes are fl exible, individu-
ally replaceable without welding or rolling.
Never more than two tube confi gurations.
D. Boiler tube and furnace area access panel:
heavy gauge steel casing with 2" high tem-
perature ceramic fi ber and insulation, bolted
and tightly sealed to boiler frame.
OPTIONAL
CONSTRUCTION:
Steam boiler
Optional construction to ASME Power
Boiler Code requirements for pressure
exceeding 150 psi to maximum of 300
psi design pressure.
Hot water boiler
Optional construction to ASME
Power Boiler Code requirements for
temperatures exceeding 240°F and/or
pressure exceeding 160 psi to maxi-
mum of 285°F operating and 300°F
design temperature and 250 psi.
OPTIONAL EQUIPMENT:
1. Manual reset high limit control
2. Manual reset low water cutoff
3. Auxiliary low water cutoff (water)
4. Combination low water cutoff
and feeder
5. Alarm bells or horns
6. UL, CUL, CSD-1, FM, IRI or
other insurance approved
control systems
7. Low re start, Hi-Lo or
modulation re control
8. Indicating lights, as desired
G
F
E
D
H
A
C
B
9. Lead-lag systems for two or
more boilers with or without
outdoor reset control
10. Heat exchanger coils for
domestic water
11. Special construction: left hand,
Knocked Down
ignition assembly, main manual gas
shut-off valve, pilot shut-off valve,
pilot and main gas pressure regula-
tors, barometric draft controller, all
controls installed and wired standard
voltage 120/1/60.
True “fl exible water tube” design guaranteed
shock free
Longer service life with superior performance
Full fi ve sq ft of heating
surface per BHP
J. Control panel: all controls installed and connected
to terminal strip.
K. Water side or steam side interior accessible for clean-
out and inspection, front and rear openings, upper
and lower drums.
L. Steam boilers with extra large drum with high steam
release area ensure stable water level and dry steam.
J
I
K
L
E. Jacket access panels make the interior of the boiler
easily accessible for service and inspection.
F. Heavy gauge steel boiler jacket with rust-resistant
zinc coating and attractive enamel fi nish, insulated
with 1½" fi berglass to insure exceptionally cool outer
surface.
G. Minimum sized fl ue vent.
I. All controls, gauges, relief valve(s) are factory installed
and wired and easily accessible for servicing.