Bradford-White Corp MI403S*F(BN Water Heater User Manual


 
BURNER CLEANING (cont.)
Step 5. Disconnect (unscrew) main burner (stamped steel “B” burner) from main
burner orifice or on cast iron burners (“C” burner), loosen air shutter &
disconnect (unscrew) feedline from burner.
Step 6. Remove main burner orifice from feed line (1/2” wrench on steel burner,
3/8" wrench on cast iron). Inspect and clean if necessary.
Step 7. Remove pilot assembly, refer to SERVICE PROCEDURE RG-III for cleaning
and inspection.
Step 8. Reassemble burner.
Step 9. Inspect combustion chamber area of heater prior to reinstallation of
burner assembly. If cleaning is required, refer to SERVICE PROCEDURE
RG-VIII.
Step 10. Reinstall burner assembly into combustion chamber, reconnect feedline, thermocouple and pilot tube
to the combination thermostat/gas valve.
Step 11. Reinstall inner door per SERVICE PROCEDURE RG-I, steps 4 through 13.
Step 12. To resume operation, follow the instructions located on the lighting instruction label or the lighting
instructions located in the installation and operation manual.
SERVICE PROCEDURE RG-VI
Burner Operation Inspection,
Adjustment, Cleaning and Replacement
19