PI - 32.52cProduct Information SM 210 LSN RW
Seite 6 von 12
601-4.998.125.088
A2.en / 29.12.2004
ST-FIR/ PRM1 / deh
7. Installation notes
Flush call point
The flush call point comes complete with a bezel and will mount onto any standard
U.K. single gang back box with a depth of min. 25mm or directly to a wall. Conside-
ration should be given to the amount of cabling space at the rear of the call point,
i.e. a deeper box or spacer eases installation.
Surface call point
The surface mounting call point comes complete with a back box onto which the
calll point is mounted. There is provision for rear cable entry. By using the template
at the leaflet, cable holes can be drilled into the top or bottom of the back box to
accept one or two cable glands - Max. dia. 20mm.
7.1. Fixing details for the indoor versions (IP 54)
See template at the call
point leaflet for the hole
positions of cable glands.
Cable feed under plaster for
detector mounting with back
box and rear cable entry
Cable feed over plaster,
via cable glands
TOP TOP
87
36
20
60
∅ 4
View: back box inside View: bezel
100
∅ 4
107