Bard WA611 Air Conditioner User Manual


 
Manual 2100-425
Page 5
SHIPPING DAMAGE
Upon receipt of equipment, the carton should be
checked for external signs of shipping damage. If
damage is found, the receiving party must contact the
last carrier immediately, preferably in writing,
requesting inspection by the carrier’s agent.
GENERAL
The equipment covered in this manual is to be
installed by trained, experienced service and
installation technicians.
The refrigerant system is completely assembled and
charged. All internal wiring is complete.
The unit is designed for use with or without duct
work. Flanges are provided for attaching the supply
and return ducts.
These instructions explain the recommended method
to install the air cooled self-contained unit and the
electrical wiring connections to the unit.
These instructions and any instructions packaged with
any separate equipment required to make up the entire
air conditioning system should be carefully read
before beginning the installation. Note particularly
“Starting Procedure” and any tags and/or labels
attached to the equipment.
While these instructions are intended as a general
recommended guide, they do not supersede any
national and/or local codes in any way. Authorities
having jurisdiction should be consulted before the
installation is made. See Page 1 for information on
codes and standards.
Size of unit for a proposed installation should be based
on heat loss calculation made according to methods of
Air Conditioning Contractors of America (ACCA).
The air duct should be installed in accordance with the
Standards of the National Fire Protection Association
for the Installation of Air Conditioning and
Ventilating Systems of Other Than Residence Type,
NFPA No. 90A, and Residence Type Warm Air
Heating and Air Conditioning Systems, NFPA No.
90B. Where local regulations are at a variance with
instructions, installer should adhere to local codes.
DUCT WORK
All duct work, supply and return, must be properly
sized for the design air flow requirement of the
equipment. Air Conditioning Contractors of America
(ACCA) is an excellent guide to proper sizing. All
duct work or portions thereof not in the conditioned
space should be properly insulated in order to both
conserve energy and prevent condensation or moisture
damage.
Refer to Table 9 for maximum static pressure available
for duct design.
Design the duct work according to methods given by
the Air Conditioning Contractors of America (ACCA).
When duct runs through unheated spaces, it should be
insulated with a minimum of 1 inch of insulation. Use
insulation with a vapor barrier on the outside of the
insulation. Flexible joints should be used to connect
the duct work to the equipment in order to keep the
noise transmission to a minimum.
A 1/4 inch clearance to combustible material for the
first three feet of duct attached to the outlet air frame is
required. See Wall Mounting Instructions and Figures
4 and 5 for further details.
Ducts through the walls must be insulated and all
joints taped or sealed to prevent air or moisture
entering the wall cavity.
Any grille that meets the 5/8 inch louver criteria, may
be used. It is recommended that Bard Return Air Grille
Kit RG-2 thru RG-5 or RFG-2 thru RFG-5 be installed
when no return duct is used. Contact distributor or
factory for ordering information. If using a return air
filter grille, filters must be of sufficient size to allow a
maximum velocity of 400 fpm.
NOTE: If no return air duct is used, applicable
installation codes may limit this cabinet to
installation only in a single story structure.
CAUTION
Some installations may not require any return
air duct. A metallic return air grille is required
with installations not requiring a return air
duct. The spacing between louvers on the
grille shall not be larger than 5/8 inches.