NetShelter 24 U AV Enclosure Installation Manual16
2. Move the vertical mounting rail to
the desired location.
3. Check alignment. Note symbols
(circle, triangle, or square) visible
through the set of three holes at
the top and bottom of the vertical
mounting rail. Make sure the
symbols match. If not, realign the
vertical mounting rail.
– Vertical mounting rails adjust
in 6-mm (1/4-in) increments.
– Make sure the vertical
mounting rails on both sides of
the enclosure are adjusted to
the same depth. Verify that the
same symbols are visible.
4. Lock top and bottom of the
vertical mounting rail.
ns1623a
ns1624a