16
VENT PIPE TERMINATION
The first step is to determine where the vent pipe will terminate. See
Figures 15, 20 and 21. The vent may terminate through a sidewall
as shown in Figure 20 or through the roof as shown in Figure 21.
The vent system must terminate so that proper clearances are
maintained as cited in local codes or the current edition of the National
Fuel Gas Code, (ANSI Z223.1, 12.9.1 through 12.9.4) or the Natural
Gas and Propane Installation Code (CAN/CSA-B149.1).
Instructions on proper installation through a sidewall are provided
in Figure 15.
Plan the vent system layout so that proper clearances are
maintained from plumbing and wiring.
Vent pipes serving power vented appliances are classified by
building codes as "vent connectors". Required clearances from
combustible materials must be provided in accordance with
information in this manual under LOCATING THE NEW WATER
HEATER and INSTALLING THE WATER HEATER, and with the
National Fuel Gas Code and local codes.
FIGURE 15
U.S. HORIZONTAL VENT CLEARANCES
CANADIAN HORIZONTAL VENT CLEARANCES
WARNING
VENT HOOD(S) MAY BE
EXTREMELY HOT
DURING OPERATION.