American Standard T555.500 Plumbing Product User Manual


 
3
5
6
3
1
2
4
2
INSTALL HANDLE
Install HANDLE BUSHING (1) onto CAP (2).
Find correct position of HANDLE (3) and push
HANDLE (3) onto VALVE STEM (4).
Install HANDLE SCREW (5) and push in INDEX
CAP (6).
Check proper operation of HANDLE.
Turn water supply on and test installed fitting.
Operate valve and diverter spout.
1
5
1
3
1
1
9
7
5
3
1
0
1
5
4
3
2
1
5
1
3
1
1
9
7
5
3
1
1
5
1
3
1
1
9
7
5
3
1
COLDER
(Larger Numbers)
0 1 3 5 7 9 11 13 15
HOTTER
(Smaller Numbers)
0 1 3 5 7 9 11 13 15
1
5
4
3
2
1
INSTALL TRIM
CAUTION: Protect finish on SHOWER ARM,
SHOWER HEAD and TUB SPOUT when installing.
2
A
6
7
3
1
4
5
5
8
By restricting HANDLE rotation and limiting the
amount of hot water allowed to mix with the
cold, the HOT LIMIT SAFETY STOP (1) reduces
risk of accidental scalding. To set the maximum
hot water temperature of your faucet, you
need to adjust the setting on the HOT LIMIT
SAFETY STOP (1).
Turn CARTRIDGE STEM (2) to the OFF position
(coldest setting) before making adjustment to
HOT LIMIT STOP (1). Use a flat blade
screwdriver to pry free the HOT LIMIT SAFETY
STOP (1).
Pull forward and rotate counterclockwise
one number to limit hot water temperature.
Use ARROW (3) on CARTRIDGE (4) and
NUMBERS (5) on HOT LIMIT STOP (1) for
indication.
M968235 Rev. 1.5
ADJUST HOT LIMIT STOP
HEX WRENCH
When finished tiling the wall, remove PLASTER GUARD (A)
and turn off water supply.
Push CAP (1) over VALVE CARTRIDGE (2).
Mount ESCUTCHEON (3) to valve body with SCREWS (4).
Remove PIPE CAPS (5) from shower pipe and tub filler pipe.
Install SHOWER ARM (6), SHOWER HEAD (7) by threading
onto pipe nipples using teflon tape or pipe sealant.
Install SLIP-ON TUB SPOUT (8). Tighten with
HEX WRENCH supplied.
1-3/4" REF.