American Standard 4137.1 Plumbing Product User Manual


 
M968208 REV. 1.4
Carefully bend COPPER SUPPLIES to meet water supply
lines using the palms of the hands to avoid kinking.
Connect HOT water supply line to left tube, and COLD
water supply line to right tube using appropriate
connectors.
2
34
FERRULE
HOT
COLD
MAKE WATER SUPPLY CONNECTIONS
Use 1/2" IPS FLEXIBLE SUPPLIES (3) or 3/8" O.D.
BULL-NOSE RISERS (4). Use adjustable wrench to tighten
connections. Do not over tighten. Be careful not to kink
copper supply when bending. Use tubing cutter to cut to
proper length.
NOTE: FLEXIBLE SUPPLIES HAVE TO BE PURCHASED SEPARATELY
3
Place WASHER (3) into COUPLING NUT (1) on HOSE (2). Thread COUPLING NUT (1) onto
HAND SPRAY (4) and tighten.
Slide COUPLING NUT (1) onto HOSE (2).
Feed small end of HOSE (2) through BODY (5) so HAND SPRAY (4) rests inside SPRAY HOLDER (6).
Pull KNURLED NUT (7) up over HOSE NUT (9). Place WASHER (11) into KNURLED NUT (7).
Thread KNURLED NUT (7) onto OUTLET TUBE ADAPTER (12) and tighten.
CONNECT SPRAY HOSE
Pull KNURLED NUT (7) down over HOSE (2) (thread faces to the small end of the hose).
Put SMALL RUBBER WASHER (8) in HOSE NUT (9) and screw HOSE NUT (9) onto HOSE END (10) and tighten.
With HAND SPRAY (4) seated in SPRAY HOLDER (6), install WEIGHTS (13) onto HOSE (2) using two SCREWS (14).
Locate the WEIGHTS (13) two feet (2') from the underside of the sink deck. Tighten SCREWS (14) firmly.
11
9
8
1
7
5
3
2
6
4
10
2
13
14
12