American Standard 2908.222 Indoor Furnishings User Manual


 
Connect HOT water supply to inlet of left SHANK and COLD
water supply to right SHANK using sealant, appropriate
connectors, and COUPLING NUTS.
Connect 1-1/4” O.D. tailpiece on POP-UP DRAIN to
waste outlet.
Thread TEE BODY (4) to SPOUT SHANK (5).
Thread HOSE CONNECTOR (6, 6A) to VALVE CONNECTIONS (7, 7A).
8
Connect water supply to VALVE BODIES (1,1A) with 1/2" IPS FLEXIBLE
SUPPLIES (2) or 3/8" O.D. BULL-NOSE RISERS (3). Use
adjustable wrench to tighten connections. Do not over
tighten. Be careful not to kink copper supply when bending.
Use tubing cutter to cut to proper length.
MAKE WATER SUPPLY AND WASTE CONNECTIONS
NOTE: FLEXIBLE SUPPLIES OR BULL-NOSE RISERS NOT INCLUDED
AND MUST BE PURCHASED SEPARATELY.
HOT
COLD
FERRULE
COMPRESSION
NUT
COUPLING
NUT
FLEXIBLE
SUPPLIES
1
1A
3/8 O.D.
BULL-NOSE
RISERS
1/2" PIPE THREAD
3/8 COMPRESSION
CONNECTION
2
3
4
5
7
6
6A
7A
Thread CABLE CONNECTOR (1) clockwise
onto DRAIN BODY CONNECTION (2) and
hand tighten. Fig. A.
Your new POP-UP DRAIN installation is
now complete. Fig. B.
Note: Tailpeice on pop-up drain is 1-1/4” O.D.
Fig. B.
Fig. A.
ATTACH CABLE CONNECTOR
6
2
1
Operate LIFT KNOB (1) to verify that STOPPER (2) opens and
closes.
Note: If STOPPER (2) does not open and close properly then
refer to the “troubleshooting section” of these instructions.
CHECK OPERATION OF POP-UP
7
1-1/4” O.D.
Fig. B.
WASTE
OUTLET
1
2
3
US60385 Rev. 1.2