Connect HOT water supply to inlet of left SHANK and COLD
water supply to right SHANK using sealant, appropriate
connectors, and COUPLING NUTS.
Connect 1-1/4” O.D. TAILPIECE (4) on POP-UP
DRAIN to
“p” trap.
8
Connect water supply to INLET SHANKS (1) with 1/2" IPS
FLEXIBLE SUPPLIES (2) or 3/8" O.D. BULL-NOSE RISERS (3).
Use adjustable wrench to tighten connections. Do not over
tighten. Be careful not to kink copper supply when bending.
Use tubing cutter to cut to proper length.
MAKE WATER SUPPLY AND WASTE CONNECTIONS
NOTE: FLEXIBLE SUPPLIES OR BULL-NOSE RISERS NOT INCLUDED
AND MUST BE PURCHASED SEPARATELY.
HOT
COLD
FERRULE
COMPRESSION
NUT
COUPLING
NUT WITH
FAUCET
COUPLING
NUT ON FLEX
SUPPLIES
FLEXIBLE
SUPPLIES
1
3/8 O.D.
BULL-NOSE
RISERS
3/8 COMPRESSION
CONNECTION
2
3
Thread CABLE CONNECTOR (1) clockwise
onto DRAIN BODY CONNECTION (2) and
hand tighten. Fig. A.
Your new POP-UP DRAIN installation is
now complete. Fig. B.
Note: Tailpeice on pop-up drain is 1-1/4” O.D.
Fig. B.
Fig. A.
ATTACH CABLE CONNECTOR
6
2
1
Operate LIFT KNOB (1) to verify that STOPPER (2) opens and
closes.
Note: If STOPPER (2) does not open and close properly then refer
to the “troubleshooting section” of these instructions.
CHECK OPERATION OF POP-UP
7
1-1/4” O.D.
Fig. B.
4
2
1
“P” TRAP
M968882 Rev. 1.3