A&D ML-50 Thermostat User Manual


 
MS-70 / MX-50 / MF-50 / ML-50 62
15.
15.15.
15. Maintenance
MaintenanceMaintenance
Maintenance
Turn off the power switch and remove power cord during
maintenance.
Cool down all parts of the analyzer before maintenance.
Pan support, sample pan and breeze break ring can be removed.
Clean the analyzer with a lint free cloth that is moistened with
warm water and a mild detergent.
Do not use organic solvents to clean the analyzer.
Dry the parts and reassemble them. Refer to "3. Precautions" and
"6.1. Installing the Analyzer"
Use the original packing material and box for transportation.
15.1.
15.1.15.1.
15.1. Cleaning the Heater Uni
Cleaning the Heater UniCleaning the Heater Uni
Cleaning the Heater Unit
tt
t
Clean the glass-housing when it is stained (not clear) to
maintain the drying performance.
The glass-housing can be removed by removing two
screws.
Remove fingerprints from the halogen lamp to keep its life.
Do not touch to reflective surface of the metal reflector.
If the surface is touched, it may be the cause of a drying
temperature error.
Do not touch the temperature sensor that is at the side
of halogen lamp. If the surface is touched, it may be the
cause of a drying temperature error.
Power cord
Outlet
Example
Halogen lamp
Heater unit
Metal reflector
Temperature sensor
Glass-housing
Screw
Screw