WayneWood Doors Models: 40,42,43,45,47
Torsion Spring Installation Instructions Layout
1A
1C
1B
LEFT HAND BOTTOM
BRACKET
2B
5B
5A
3A
g
WEATHER
SEAL
JAMB
DOOR
6
3B
3-1/4”
10
14
17
15
3/4”
ROOFING
NAIL
LEVEL
12
13
16
a
h
a
a
k
k
p
p
p
g
i
e
e
p
p
p
m
m
p
p
g
g
p
j
INSERT COUNTER-BALANCE CABLE
BEND
20
b
d
b
d
e
e
e
n
b
b
n
p
p
m
m
21
j
2-1/2” (64 mm)
4B
ALIGN
HOLES
15” RAD.
12” RAD.
RED
BLACK
11B
q
ANGLED
EXTENSION
OUTSIDE
18B
18A
1/8”-1/4”
OPTIONAL SELF-
DRILLING SCREW
2A
g
g
7A
8
11A
CENTER
STILE
4A-4B
4A
22
STRUT
CLIP
9
1-11/16”
(43 mm)
1D
e
h
a
g
p
p
LEFT HAND BOTTOM
BRACKET
2C
i
p
j
p
p
NOTE: If you have riveted track, skip this step.
Fully adjustable track:
NOTE:
Q.I. Track:
NOTE: If you have riveted track, skip this step.
Q.I. Track:Quick Install Jamb Bracket Schedule
-
NOTE:
2C
IMPORTANT!
IMPORTANT!
START HERE
IMPORTANT!-
-
WARNING!
NOTE:
CONTINUE INSTALLATION INSTRUCTIONS ON REVERSE SIDE.
NOTE: If you have riveted track, skip this step.
Fully adjustable track:
-
NOTE:
1B-1C
2B
-
2B
IMPORTANT!
IMPORTANT!
furthest away from section. See 3B.
Strut Installation (if necessary):
Fig 22 this page and Strutting Schedules
NOTE: In the event that the bottom section was shimmed to level it, then the vertical track on that same side of the
IMPORTANT! The tops of the vertical tracks must be level from side to side. If the bottom section was shimmed
6A-6B
NOTE:
Proper adjustment will be required once the track is installed.
Strut Installation (if necessary):
NOTE:
IMPORTANT!
the track.
of the vertical track. Fully adjustable track:
NOTE:
Q.I. Track:
IMPORTANT!
WARNING!
11A-11B
IMPORTANT!
12
IMPORTANT!
IMPORTANT!
13
NOTE:
NOTE:
NOTE:
14
IMPORTANT!
-
WARNING!
FAILURE TO CLAMP TRACK CAN ALLOW DOOR TO RAISE AND CAUSE SEVERE INJURY OR
DEATH.
15
Thread the counterbalance cables around the back side of the cable drums and verify that there is no cable obstructions.
NOTE: Some cable assemblies only have the crimped cable button.
CAUTION!-
sion.
16
1A
2A
3A-3B
Strut Installation (if necessary):
5A-5B
10
7A
1D
9
8