Watlow Electric 397 Electric Heater User Manual


 
397
W A T L O W
Circulation Heaters
Tubular and
Process Assemblies
Circulation Heaters
Engine Preheaters
Application Hints
Mount engine preheaters in
horizontal position only (as shown
in Figures #1, #2 and #3). Consult
your Watlow representative if
vertical mounting is unavoidable.
Mount the heater near or below
the lowest point on the engine
block. Keep outlet nozzle pointed
up, as indicated on the tank.
Estimate kilowatt requirements
with the following formula. First
determine the engine
displacement, then multiply:
English
Cubic inches X 3 = estimated wattage
Metric
Liters X 183 = estimated wattage
Application: Ethylene Glycol/Engine Coolant
1.13 20
7
8 (530) CPBPL2S12 12 (6)
1.50 20
7
8 (530) CPBPB6S12 CPBPB2S12 12 (6)
1.69 20
7
8 (530) CPBPM2S12 12 (6)
1.88 20
7
8 (530) CPBPN2S12 12 (6)
2.00 20
7
8 (530) CPBPC6S12 12 (6)
2.25 20
7
8 (530) CPBPD6S12 12 (6)
2.25 26
11
16 (678) CPBPD2S12 15 (7)
2.50 20
7
8 (530) CPBPE6S12 12 (6)
3.00 26
11
16 (678) CPBPF2S12 CPBPF7S12 15 (7)
3.75 26
11
16 (678) CPBPG2S12 15 (7)
4.00 26
11
16 (678) CPBPH7S12 15 (7)
5.00 26
11
16 (678) CPBPJ7S12 15 (7)
Overall Code No. Est. Ship.
kW
Length
120/240VÅ(ac) 208VÅ(ac) 240/480VÅ(ac) Weight
Inch (mm) 1-Phase 1-Phase 1-Phase lbs (kg)
Figure 1
All preheaters are Stock unless
otherwise noted.
Availability
Stock: Same day shipment
Standard: Four weeks
Standard
Overall Length ±
3
/8
"
(10 mm)
1
1
/2
"
(38 mm)
2
1
/4
"
(57 mm)
Ref. Diameter
(4) Mounting Slots
9
/32
"
X
3
/4
"
(7 mm X 19 mm)
4
5
/8
"
(117 mm)
3
3
/4
"
(95 mm)
1
"
(25 mm)
2
"
(50 mm)
(4)
1
/4-20
Bolts,
5
/8
"
(16 mm)
Threaded
Length
2
3
/16
"
(56 mm)
6
3
/16
"
(157 mm)
3
1
/8
"
(79 mm)
6
3
/8
"
(162 mm)
Up Outlet
4
5
/8
"
(117 mm)
Outlet Nozzle
Sized for 1" I.D.
(25 mm) hose
Vibration
Isolator Bushings
Mounting Slots
1
/4
"- 20
Mounting Bolts
(2) Mounting Studs
Drain
NEMA 1 Terminal Enclosure
WATROD Heating Element
Thermowell
Check Valve
Inlet Nozzle
Sized for 1" I.D.
(25 mm) hose
F.O.B.: Hannibal, Missouri