Baxi Potterton 80 HE Boiler User Manual


 
10.0 Completion
28
10.1 Completion
1. Hinge the facia panel upwards and refit the case
front panel. Tighten the securing screws (Fig. 38).
2. Instruct the user in the operation of the boiler and
system, explaining the operational sequence.
3. Carefully read and complete all sections of the
Benchmark Commissioning Checklist at the rear of this
publication that are relevant to the appliance and
installation. These details will be required in the event
of any warranty work. The publication must be handed
to the user for safe keeping and each subsequent
regular service visit recorded.
4. For IE, it is necessary to complete a “Declaration of
Conformity” to indicate compliance with I.S. 813. An
example of this is given in I.S. 813 “Domestic Gas
Installations”. This is in addition to the Benchmark
Commissioning Checklist.
5. Hand over the Users Operating, Installation and
Servicing Instructions, giving advice on the necessity of
regular servicing.
Fig. 38
Facia Panel
Case Front Panel