Maytag HRN11240P Water Heater User Manual


 
20
75 GALLON 70,000 AND 75,000 BTU/HR MODELS ONLY -
OPTIONAL 4” VENT PIPING
4” PVC, ABS or CPVC Schedule 40 vent piping:
A wire screen to fit a 4” PCV, ABS or CPVC Schedule 40 - 45
o
vent cap is supplied with the water heater.
A 4” PVC, ABS or CPVC Schedule 40
- 45
o
vent cap (must be
supplied locally).
A 3” PVC, ABS or CPVC Schedule 40 pipe, minimum length
of 3” (must be supplied locally), to make vent connection at
the blower outlet.
A 4” to 3” PVC, ABS or CPVC Schedule 40 reducer (must be
supplied locally).
A 4” PVC, ABS or CPVC Schedule 40 - 90
o
street ell; used to
connect the vent pipe to the reducer when the vent pipe is to
be turned horizontally off the blower (supplied locally).
4” PVC, ABS or CPVC Schedule 40 pipe (must be supplied
locally).
FIGURE 31.
The water heater requires its own (separate) venting
system.
4” and 3” PVC, ABS or CPVC Schedule 40 piping and fittings
are acceptable materials for the vent system on all 75 gallon
70,000 and 75,000 BTU/HR models.
It cannot be connected to existing vent piping or chimney.
It must terminate horizontally to the outdoors.
ALL 40 AND 50 GALLON 40,000 BTU/HR MODELS ONLY
3” PVC, ABS or CPVC Schedule 40 vent piping:
A 3” PVC Schedule 40 - 45
o
vent cap with wire screen is
supplied with the water heater.
A 3” PVC, ABS or CPVC Schedule 40 - 90
o
street ell; used to
connect the vent pipe to the water heater when the vent pipe
is to be turned horizontally directly off the blower (supplied
locally).
3” PVC, ABS or CPVC Schedule 40 pipe (must be supplied
locally).
FIGURE 32.
The water heater requires its own (separate) venting
system.
3” PVC, ABS or CPVC Schedule 40 piping and fittings are
acceptable materials for the vent system on all 40 and 50
gallon 40,000 BTU/HR models.
It cannot be connected to existing vent piping or chimney.
It must terminate horizontally to the outdoors.
ALL 40 AND 50 GALLON 40,000 BTU/HR MODELS - OPTIONAL
2” VENT PIPING
2” PVC, ABS or CPVC Schedule 40 vent piping:
A wire screen to fit a 2” PCV, ABS or CPVC Schedule 40 - 45
o
vent cap is supplied with the water heater.
A 2” PVC, ABS or CPVC Schedule 40 - 45
o
vent cap (elbow)
(must be supplied locally).
A 3” PVC, ABS or CPVC Schedule 40 pipe, minimum length
of 3” (must be supplied locally), to make vent connection at
the blower outlet.
A 3” to 2” PVC, ABS or CPVC Schedule 40 reducer (must be
supplied locally).
A 2” PVC, ABS or CPVC Schedule 40 - 90
o
street ell; used to
connect the vent pipe to the reducer when the vent pipe is to
be turned horizontally off the blower (supplied locally).
2” PVC, ABS or CPVC Schedule 40 pipe (must be supplied
locally).
FIGURE 33.