Lightolier IS-CWLPC120 Indoor Furnishings User Manual


 
Lightolier is a Philips group brand
631 Airport Road, Fall River, MA 02720 • (508) 679-8131 • Fax (508) 674-4710
We reserve the right to change details of design, materials and finish.
www.lightolier.com © 2008 Philips Group • A1008
Architectural Decorative IS-CWLPC120
Page 1 of 1 Instruction Sheet for Assembly and Installation
Read and understand these instructions before installing luminaire
This luminaire is intended for installation in accordance with the National Electrical Code and local regulations. To assure full compliance with local codes and
regulations, check with your local electrical inspector before installation. To prevent electrical shock, turn off electricity at fuse box before proceeding.
Retain these instructions for maintenance reference.
1. Remove knockout from junction box. (Fig. 1)
2. Slide strain relief at least six inches in from lead end of leader cable.
(Fig. 2)
Tighten two screws on the strain relief clamp to lock it in place.
3. Pass cable though knockout and slide strain relief nut down cable.
(Fig. 3)
4. Tighten nut to lock strain relief in place. When properly installed,
strain relief should look like this (Fig. 4):
At least six inches
Leader cables for concealed white luminaires installed in North America must, in order to comply with
Underwriters Laboratories rules for installation, have a strain relief on the leader cable where it emerges from
junction box.
Strain relief is included in leader cable kit for 120 VAC installations in North America.
Fig. 1
Fig. 2
Fig. 3
Fig. 4
Junction Box
Screw
Strain Relief
Knockout
Strain Relief Nut