England's Stove Works 25PAH Gas Heater User Manual


 
Page | 11
INSTALLATION
ApprovedVentingMethod2
:ThroughtheCeiling
Ventingthroughtheceiling/roofmaybetheonly
feasibleventingoptioninsomecasesandisafactory
recommendedinstallation.
Wheninstallinganyventingsystem,TypeLorType
PLpipemustbeusedandallclearancesto
combustibleslistedbythepipemanufacturermust
bestrictlyadheredto.
Usethepipemanufacturer’sapprovedceiling
supportforpassingthroughacombustibleceiling,as
wellastherequiredfirestops,radiationshields,
flashingandstormcollar.
Becertaintofollowthemanufacturer’srequired
heightofterminationabovetheroofline,and
maintainatleasttheminimumclearancesto
combustibles.
Useanappliancecollarwherethepelletvent
connectstotheexhaustoutputofthepelletstove
andattachtheappliancecollartotheexhaustbloweroutputusingthreesheetmetal
screws.
SealeachpipeconnectionjointwithhightemperatureRTVSilicone,toensurethesystemis
leakfree(Checkwiththespecificpipemanufacturer’sinstructionsbeforedoingso).
Ifthepelletventpipebeingusedisnota“TwistLock”system,three(3)sheetmetalscrews
arerequiredateachpipejoint.
Connectthepelletstovetooutsidecombustionairusingthekitincludedwithyour
stoveor
usinganalternativemethod,asdescribedinthe“OutsideAir”section,onpage14.
Thisventingmethodcanalsobemodifiedsothattheventingsystemrunshorizontally
throughthewallfromthestove,thentransitionstoverticalandterminatesabovethe
roofline.Whenusingthismodifiedversionofthisinstallationbecertaintocarefullyfollow
theventingsystemmanufacturer’sinstructionsdiligently.
Please Note:
Installation diagrams are for reference purposes only and are not drawn to scale, nor meant to be used as plans for each individual
installation. Please follow all venting system requirements, maintain the required clearances to combustibles, and follow all local
codes.
For high altitude installations (above 4,000 ft.), the vent pipe should be
increased from 3-inch
(
3”
)
to four-inch
(
4”
)
.