Empire Comfort Systems RB) Furnace User Manual


 
12426-4-0104 Page 9
Figure 2
FINISHING INSTRUCTIONS
Plastering (Figure 4)
In new construction use only plain (not perforated) gypsum lath
around furnace and vent pipe so that plaster "Keys" will not project
into wall space.
Use wood strips nailed to inside of studs and top of bottom plate.
These must be removed before installation of furnace. Lath and
plaster against top projection of Header Plate.
Do not allow wall Þ nish materials to project into furnace re-
cess..
Figure 4
Installing Furnace (Figure 5)
Clear the recess of all debris, and remove any wood plaster-grounds.
Stand the furnace on ß oor in front of wall opening.
Insert furnace ß ue into rectangular opening in header plate and
raise furnace carefully (see Figure 5). Swing bottom of furnace
into wall opening with back of legs ß ush with rear of ß oor plate.
Secure furnace support legs to the ß oor plate.
Figure 5