Desa CB36P Gas Heater User Manual


 
www.desatech.com
117437-01D 7
Figure 5 - Framing Clearances for Flush
Wall Installation
36"
(91.4 cm)
36
1
/4"
(92.1 cm)
14
3
/4"
(37.5 cm)
Figure 6 - Framing Clearances for Corner
Installation
28
5
/
8
"
(72.7 cm)
21" (53.3 cm)
To Center of
Top Vent
14
3
/
4
"
(37.5 cm)
14
3
/
4
" (37.5 cm)
to Nailing
Flanges
56
3
/
4
"
(144 cm)
12
1
/
4
"
(31 cm)
to Opening
PRE-INSTALLATION PREPARATION
Continued
Figure 7 - Unit Dimensions
14
3
/
4
" (37.5 cm)
to Nailing Flanges
7
7
/
8
" (20 cm) to
Center of 4" B-Vent
5
7
/
8
"
(15 cm) to
Nailing
Flange
36
1
/
4
" (92.1 cm)
to Nailing Flange
36
1
/
4
" (92.1 cm)
Face Dimensions
1
1
/
2
" (3.8 cm)
2
1
/
2
" (6.4 cm)
6" (15.2 cm)
5/8"
(16 mm)
11
1
/
8
"
(28.3 cm)
Air Kit Location
1
1
/
4
"
(3.2 cm)
2"
(5.1 cm)
38"
(96.5 cm)
15
3
/
8
"
(39 cm)
36" (91.4 cm)
Face Dimensions
37" (94 cm)
to Nailing Flange
35
3
/
4
"
(90.8 cm)
4
1
/
2
" (11.4 cm) Electrical Inlet
36
3
/
4
" (93.4 cm)
Wall Switch
Wireway
Wall Switch
Wireway
8" (20.3 cm)
Gas Supply
Inlet
**These dimensions allow for 1" clearance at

is also permitted at all sides when framed.
**