Carrier 24ANA Air Conditioner User Manual


 
12
OAT Thermistor must be locked in
place with spherical nib end facing to-
wards the fr ont of the control box
Fig. 8 -- Outdoor Air Thermistor (OAT) Attachment
OCT Thermistor must be
secured tight on the liquid
tube.
Fig. 9 -- Outdoor Coil Thermistor (OCT) Attachment
FINAL CHECKS
IMPORTANT: Before leaving job, be sure to do the following:
1. Ensure that all wiring is routed away from tubing and sheet
metal edges to prevent rub--through or wire pinching.
2. Ensure that all wiring and tubing is secure in unit before
adding panels and covers. Securely fasten all panels and
covers.
3. Tighten service valve stem caps to 1/12--turn past finger
tight.
4. Leave Users Manual with owner. Explain system operation
and periodic maintenance requirements outlined in manual.
5. Fill out Dealer Installation Checklist and place in customer
file.
CARE AND MAINTENANCE
For continuing high performance and to minimize possible
equipment failure, periodic maintenance must be performed on this
equipment.
Frequency of maintenance may vary depending upon geographic
areas, such as coastal applications. See Users Manual for
information.
24ANA