Carrier 17EX Air Conditioner User Manual


 
INDEX (cont)
Control,
Auxiliary Compressor Oil Pump, 33
Auxiliary Gear Oil Pump, 33
Capacity, 32
Condenser Pump, 36
Entering Chilled Water, 32
High Discharge Temperature, 35
Ice Build, 40
Lead/Lag, 38
Oil Sump Temperature, 35
Ramp Loading, 33
Control Algorithms Checkout Procedure, 85
Control and Oil Heater Voltage Selector (S1), 16
Control Center, 5
Control Center, Inspect the (Scheduled Maintenance), 76
Control Configuration, Set Up Chiller, 54
Control Modules, 96
Control Settings, Pumpout Safety, 83
Control System (Instruct the Operator), 62
Control Test (Troubleshooting Guide), 85
Control Test, Perform and Automated, 56
Control Transformers (T1-T4), 16
Controller Identification, Modify If Necessary, 55
Controls, 11
Controls,
Remote Start/Stop, 36
Safety, 33
Cooler, 5
Cooler (Inspect the Heat Exchanger Tubes), 82
Cooler-Condenser (Instruct the Operator), 62
Cooler/Condenser/Compressor Section, Transferring
Refrigerant Into the, 67
Coupling, Disc, Installation and Alignment, 59
Coupling Maintenance, 78
Cycle,
Lubrication, 8
Oil Cooling, 8
Refrigeration, 5
Cycles, Chiller (Instruct the Operator), 62
Date, Input Time and, 55
Deadband (PIC System Functions), 32
Default Screen Freeze, 33
Default Screen Menu Items, LID, 17
Defective Processor Modules, Replacing, 98
Definitions, 11
Dehydration, Chiller, 49
Demand Limit Control Option (Requires Optional
8-Input Module), 37
Demand Limiting, 32
Design Set Points, Input the, 54
Device (LID), Local Interface, 16
Digital Signal (Control), 11
Disc Coupling Installation and Alignment, 59
Display Messages, Checking the, 84
Doweling, (Chiller Alignment), 75
Doweling, (Initial Start-Up), 61
Downtime, Extended (External Gear Storage), 82
Dry Nitrogen, To Pressurize With, 68
Dry Run to Test Start-Up Sequence, 58
Dual Temperature Sensors (Checking Temperature
Sensors), 84
Duties, Operator, 62
Economizer/Storage Vessel (Instruct the Operator), 62
Economizer/Storage Vessel and Pumpout System,
Using the, 45
Economizer/Storage Vessel, 5
Economizer/Storage Vessel, Transferring Refrigerant
Into the, 66
Eight-Input Modules, 16
Electrical Connection, Motor, 45
Entering Chilled Water Control, 32
Equipment Configuration, Modify If Necessary, 56
Equipment Required (Before Initial Start-Up), 45
Equipment Service Parameters, Input If Necessary, 55
Extended Downtime (External Gear Storage), 82
Extended Shutdown, 63
Extended Shutdown, After, 63
External Gear (Remove Shipping Packaging), 45
External Gear Lubrication Cycle, 9
External Gear Lubrication System (Instruct the
Operator), 62
External Gear Maintenance, 82
External Gear Oil (Oil Changes), 77
External Gear Oil Cooling, 8
External Gear Oil Filter (Changing the Oil Filters), 77
External Gear Pre-Start Checks, 51
External Gear Replacement Parts, 83
External Gear Storage, 81
Familiarization, 17EX Chiller, 5
Faulted Chiller Operation (Lead/Lag Control), 40
Filter,
Compressor Oil (Changing the Oil Filters), 76
External Gear Oil (Changing the Oil Filters), 77
Final Alignment (Chiller Alignment), 74
Four-In/2-Out Module, 16, 98
Freeze, Default Screen, 33
Freeze Prevention, Condenser, 36
Functions, PIC System, 32
Gasketed Joints and Guide Vane Shaft Packing,
Tighten All, 46
Gear, External, 45
Gear Maintenance, External, 82
Gear Oil Pump Contactor (5C), and Compressor
Oil Pump Contactor (2C), 16
Gear Oil Pump Control, Auxiliary, 33
General (Controls), 11
General (LID Operation and Menus), 16
General Maintenance, 67
Green LEDs (Control Modules), 96
Guide Vane Linkage, Checking, 68
Guide Vane Operation, Manual (Operating Instructions), 63
Guide Vane Shaft Packing, Tighten All Gasketed
Joints and, 46
Guide Vanes, Manual Operation of the, 58
Guide, Troubleshooting, 83
Handling/Rigging, Motor, 81
Heat Exchanger Tubes, Inspect the (Scheduled
Maintenance), 82
High Altitude Locations, 57
High Discharge Temperature Control, 35
Holiday Scheduling (Service Operation), 42
Hot Alignment Check, 61
Hot Alignment Check (Chiller Alignment), 74
Hot Gas Bypass Contactor Relay (3C) (Optional), 16
Ice Build,
Temperature Control During (Ice Build Control), 41
Termination of (Ice Build Control), 41
Ice Build Control, 40
Ice Build Initiation (Ice Build Control), 40
Identification Label, Chiller, 5
Important Information (Disc Coupling Installation
and Alignment), 61
Initial Start-Up, 57
Initial Start-Up Checklist for 17EX Externally
Geared Centrifugal Liquid Chiller, CL-1 to CL-12
116