American Water Heater ADCG Water Heater User Manual


 
18
INSTALLATION CHECKLIST
Water Heater Location Requirements
Centrally located with the water piping system.
Located as close to the gas piping and vent
pipe system as possible.
Located indoors and in a vertical position.
Protected from freezing temperatures.
Proper clearances from combustible surfaces
maintained and not installed directly on a
carpeted floor. Sufficient room to service the
water heater.
Provisions made to protect the area from water
damage. Properly sized drain pan installed and
piped to an adequate drain.
Installation area free of corrosive elements and
flammable materials.
Vent Pipe System
Draft hood and damper properly installed
Vent connectors securely fastened with screws
and supported properly to maintain 6” (152mm)
clearance.
Vent pipe and fittings of approved material.
Acceptable size, length, and number of elbows
on exhaust outlet pipe.
Installed in accordance with prevailing
provisions of local codes, or in the absence of
such, National Fuel Gas Code, NFPA 54, ANSI
Z223.1-Latest Edition. Canadian Installations
must be performed in accordance with
CAN/CSA-B149.1.
Drafthood or vent pipe should not be obstructed
in any way.
Vent Termination
Vertical
Vertical gas vents must terminate with a listed
cap or other roof assembly and be installed
according to their manufacturer’s instructions.
Water System Piping
Temperature and pressure relief valve properly
installed with a discharge line run to an open
drain and protected from freezing.
All piping properly installed and free of leaks.
Water heater completely filled with water.
A properly sized expansion tank must be
installed on all closed systems.
A tempering valve should be installed per
the manufacturer’s instructions.
Gas Supply and Piping
If using a flexible gas connector, make sure its
rating tag matches or exceeds the input of the
water heater.
Adequate pipe size and of approved material.
Gas supply is the same type as listed on the
water heater data plate.
Gas line equipped with full opening shut-off
valve, union and drip leg.
Approved pipe joint compound used.
Chloride-free soap and water solution or other
approved means used to check all connections
and fittings for possible gas leaks.
Electrical Connections
Unit must be “hard-wired” to a dedicated 120V
power supply
Proper polarity.
Water heater properly grounded.
Installed in accordance with prevailing
provisions of local codes, or in the absence of
such, National Electrical Code, ANSI/NFPA 70
and/or the CSA C22.1, Electrical Code.
Index